Steel-frame crating, traceable batch numbers, full documentation pack. FOB Tianjin or Qingdao, FCL or LCL – your door arrives ready to install, not ready to repair.
Every door is fully assembled and tested before it is disassembled for packing. Four stages stand between your product and the open sea.
Door fully assembled and 100,000-cycle tested at factory. FAI photos taken from every angle. Then disassembled into components for packing.
Each panel wrapped in pearl cotton EPE foam. Hardware bagged and labeled by station. Motor and control box packed in a separate padded crate.
Custom steel frame welded to door dimensions. Components bolted to frame to prevent shifting in transit. No loose cargo, no impact damage.
Stretch film plus waterproof membrane. Batch number, handling icons and “THIS SIDE UP” stenciled. Container loading plan attached to crate.
Standard production runs 12 days per container. Your exact timeline depends on order type and customization scope.
| Order Type | Lead Time | Notes |
|---|---|---|
| Sample / single unit | 7-15 days | Includes FAI photo report before disassembly |
| Standard container (repeat spec) | 12-20 days | 12 days per container production baseline |
| Custom first order | 20-35 days | Includes tooling setup, technical confirmation, pre-production sample |
| Repeat order (same spec) | 15-20 days | Tooling archived – no setup delay |
| Spare parts (in warranty) | 3-5 days production + 5-7 days DHL | Express courier to your door |
Production starts upon 30% deposit receipt. We send weekly photo/video progress updates so you always know where your order stands.
We ship FOB Tianjin or FOB Qingdao as standard. Need us to arrange ocean freight? CIF and CFR available on request. Exports to 50+ countries, 5,000+ overseas projects delivered.
No chasing paperwork after the vessel sails. Your documentation pack is prepared, verified and loaded with the goods.
Speed test, noise measurement, insulation resistance check and visual QC – signed by our quality engineer.
Proves rated lifespan before the door ships. Full cycle log with speed and torque data attached.
Full door assembled at factory – your proof of completeness before disassembly and packing.
English installation manual and wiring diagrams – everything your installer needs on site.
Declaration of Conformity and EN 13241 test report – for customs authorities and building inspectors.
Standard export documents for smooth customs clearance at your port of entry.
Transparent terms that scale with trust. Start with T/T, graduate to open account as the relationship grows.
Production starts at deposit receipt. Goods ship after balance confirmed against Bill of Lading copy. Standard for first and second orders.
Irrevocable, confirmed Letter of Credit from a top-50 bank. Documents released against compliant presentation. Ideal for project-based procurement.
Available after 3rd order. Ship first, pay later. Based on mutual trust built over years of on-time delivery and consistent quality.
Your second order is faster, cheaper and simpler than your first. Here is why 70% of our revenue comes from returning buyers. See our factory story or explore OEM/ODM services.
Your molds and jigs are archived for up to 5 years. Repeat orders skip setup entirely – zero extra tooling cost.
15-20 days versus 20-35 for a first order. We already know your spec, your color, your hardware configuration.
Repeat clients get production slot priority during peak season (Sep-Nov). Your container does not wait in queue.
OA 30 days unlocked after your 3rd order. Cash flow stays with you while we produce and ship.
More questions? Visit our full FAQ page or reach out directly.
Yes. We send FAI photos and a video walkthrough of your assembled door. Third-party inspection (SGS, Bureau Veritas) is welcome at our factory before container loading. You approve, then we ship.
Photograph the damage within 7 days of receipt. We file the insurance claim and ship replacement parts free of charge. Our steel-frame crating keeps the damage rate under 0.3% across 5,000+ shipments – but we stand behind every unit regardless.
We provide all export documents: Certificate of Origin, CE Declaration, packing list and Bill of Lading. Import clearance is your broker’s responsibility – but having shipped to 50+ countries, we can advise on common requirements for your market.
FOB terms cover delivery to Tianjin or Qingdao port. For inland delivery within China, we can arrange trucking to any city. For overseas inland destinations, we quote CIF to your nearest port – your forwarder handles the last mile.
You receive the container number, vessel name, ETD and ETA immediately after loading. We also send loading photos and a short video of your goods going into the container, so you have visual confirmation before the ship leaves port.
Send your door specs and destination port. We will return a FOB or CIF quote with lead time, container plan and documentation list – within 2 business days.