The order confirmation puts two dates on the procurement calendar: the day the deposit lands in the manufacturer’s account, and the day the production line is supposed to start. Everything in between — drawings, fabrication, ocean freight, customs, civil works — belongs to somebody else. When the door misses the start date, nobody can say which week actually slipped.
We fabricate industrial doors — sliding, folding, vertical-lift and fire-rated models. We do not send installation crews, so the weeks between our workshop and your opening are yours to manage. What our factory controls, we publish as numbers.